Transportation Of The Biggest TBM in Turkey
Turkey’s biggest Tunnel Boring Machine (TBM) with 13,77 diameter is transported for a high speed train Project tunnel from Ankara to Eşme/Uşak. The entire shipment consists of 1,325 pcs and 5,000 tons . 61 standart , 27 flat bed , 19 lowbeds and 15 hydraulic trailers were used throughout the project.