Transformer Sliding Service

In April 2007, 150 tons and 155 MWA transformers have been moved from their previous places by sliding and lifting by jacking system and transported with 10 axle hydraulic platform trailer and placed on to their new places in Çayırhan Thermal Power Plant by the same sliding and lowering by jacking method.